Town Square

Monte Vista students hammer away at old library

Original post made on Apr 6, 2012

Approximately 15 students, who were either members of the leadership team or the student design committee, donned hard hats and goggles to pose with sledgehammers already stuck in the library wall. The new facility, which will replace the original 1965 library, will be multi-story structure incorporating an expanded library and career center.

This story contains 289 words.

If you are a paid subscriber, check to make sure you have logged in. Otherwise our system cannot recognize you as having full free access to our site.

If you are a paid print subscriber and haven't yet set up an online account, click here to get your online account activated.


Like this comment
Posted by Alamo Parent
a resident of Alamo
on Apr 6, 2012 at 7:40 am

What MV really needs is a new gym. With the districts richest area that attends this school the athletic facilities are an embarrassment. The sound system cuts out all the time. The gym floor has metal covers that have to be taped down during games as the pop off, the size for seating vs. the student body that attends the games. SRVUS should look to Dublin and surrounding cities as taking care of their athletic teams to give them all they need to succeed.

Like this comment
Posted by Mom
a resident of Diablo
on Apr 6, 2012 at 8:38 am

Finally there is something for the smart kids!! Life as we know it would be so different without facilities like these! Thank You!!